ARCHITECT:
Scott Carver Architects
BUILDER:
ProBuild
STRUCTURAL ENGINEER:
ARUP
ROOFING CONTRACTOR:
Sahara Roofing
PROJECT SPECIFICS:
6500m2 of 1mm Zincalume® steel ARAMAX® roofing
5,500m2 of 1.2mm perforated plain Aluminium ARAMAX® ceiling
141.5 metre sheet lengths rolled onsite
COMPLETED:
Early 2015
The Project
Completed in early 2015, Netball Central Sydney is the latest addition to Sydney Olympic Park’s portfolio of 47 world-class sporting and recreational facilities. The $27 million world-class facility represents the largest infrastructure investment in Women’s sport in Australia and will be home to various world class matches. Fielders was contracted to provide the unique V-shaped ARAMAX® 800 roofing material for the facility, which would be designed to double as the internal ceiling of the netball courts and surrounding gymnasium areas. The building contains six new state-of-the-art sprung floor courts, plus gymnasium and sports science facilities, and will be the headquarters for Netball NSW. Fielders worked with ProBuild, Sahara Roofing, ARUP and Scott Carver Architects to bring the new facility to life.
The Process
Netball Central Sydney was constructed throughout 2014 and completed in early 2015. The ARAMAX® roofing sheets were rolled on-site at Sydney Olympic Park using the Fielders Mobile Mill® and were lifted onto the top of the building by Fielders' two 60 metre spreader bars which worked together simultaneously.
The Solution
Fielders ARAMAX® was selected due to the material's expressive V-shaped aesthetic which worked well with the main structure element of Laminated Veneer Lumber (LVL). The profile’s capability to deliver an integrated roofing and ceiling solution, along with long spanning capabilities of over 140 metres, made it the preferred product for the facility.